The week is over and I got an ok amount of work done. I had to work around other projects and commitments. It's 10:30 pm and I just finished gluing in the additional internal stringer I've added to both hulls at the deck level. In the end I wasn't totally happy with the way it worked out on Hull 1 so I changed it. In Hull 2 I used a 3/4 x 1 inch stringer with a 10 degree angle cut into the gluing face where it attaches to the side. It worked charms stiffening up the topside and getting what edge set there was out. It's warm here so if the glue is dry to the touch tomorrow I'll flip the hull over and prepare to glass the outside of the hull.
Friday, March 23, 2007
The week is over and I got an ok amount of work done. I had to work around other projects and commitments. It's 10:30 pm and I just finished gluing in the additional internal stringer I've added to both hulls at the deck level. In the end I wasn't totally happy with the way it worked out on Hull 1 so I changed it. In Hull 2 I used a 3/4 x 1 inch stringer with a 10 degree angle cut into the gluing face where it attaches to the side. It worked charms stiffening up the topside and getting what edge set there was out. It's warm here so if the glue is dry to the touch tomorrow I'll flip the hull over and prepare to glass the outside of the hull.
0 Comments:
Post a Comment
<< Home