I worked like mad today. I made blocking for the forward beam, aft side, dry fitted all the pieces drilled holes for screws, glued the blocks and lower half of the upper flange on and as I almost forgot added a fillet at the juncture of the flange and web on the forward side. I also got back to the hull. I the first round of filling on one side and started filling low areas noted in earlier posts on the serrated side and started filling the gaps left bu the serrated trowel. I'm going to let all this work set up before I push on.
Thursday, January 18, 2007
I worked like mad today. I made blocking for the forward beam, aft side, dry fitted all the pieces drilled holes for screws, glued the blocks and lower half of the upper flange on and as I almost forgot added a fillet at the juncture of the flange and web on the forward side. I also got back to the hull. I the first round of filling on one side and started filling low areas noted in earlier posts on the serrated side and started filling the gaps left bu the serrated trowel. I'm going to let all this work set up before I push on.
0 Comments:
Post a Comment
<< Home